What is a change management plan and how to create one (with templates)

Implement, track, and scale change management plans with Freshservice to ensure seamless transitions and deliver lasting, sustainable results.

Try it FreeGet a demo
change management models

Employees rarely notice when change goes smoothly, but instantly feel frustrated when it doesn't. Research shows that half of change initiatives fail and only 34% are clear success. The strategy or technology rarely fails; it’s the absence of a fixed structure that empowers people to adapt and move through transitions more freely.

That's where a change management plan proves its value. With platforms like Freshservice, organizations can reduce resistance, align stakeholders, and ensure adoption happens with confidence and not confusion.

Let’s dive into what a change management plan is and why it’s important. We’ll also walk through a step-by-step process to creating one, along with practical templates and frameworks to help make any transformation smoother.

What is a change management plan?

A change management plan is a structured approach to helping individuals, teams, and organizations move from their current state to their desired future state. It outlines the steps, resources, and communication strategies needed to guide people through change with clarity and purpose.

This plan ensures the transition is intentional and not chaotic, whether you're rolling out a new technology or shifting internal processes. It helps identify who is affected, what support they need, and how success will be measured.

An organizational change management plan may focus on reshaping company culture or restructuring teams. In IT, it often supports system upgrades, change management software tool implementations, or security changes. The goal remains the same: to reduce resistance, increase adoption, and make changes stick.

A change management plan also documents the process and gives leaders and project managers a clear path to follow, one that's repeatable, trackable, and aligned with business goals.

Why does a structured change management plan matter?

Change affects more than just systems and processes; it affects people. A change management plan helps guide those people through uncertainty with structure and clarity.

Here's why having a plan in place makes a real difference:

  • Reduces resistance: When people don't understand why change is happening or how it affects them, resistance grows. A structured plan addresses concerns early and creates space for open communication.

  • Aligns stakeholders: Clear roles and communication channels keep leadership, project teams, and frontline staff aligned. Everyone knows what to expect and when.

  • Improves adoption rates: The plan outlines how users will be trained and supported, thereby increasing their confidence and willingness to adapt.

  • Maintains business continuity: You can move forward without disrupting daily operations by planning for phased rollouts or backup systems.

Key components of an effective change management plan

A change management plan is most effective when it covers the correct elements. Each section should guide people, processes, and systems through change while minimizing disruptions.

Here are the essential components of a change management plan and why they matter:

  • Objectives: Defines the purpose of the change and the results leaders want to achieve. They set a clear direction, help prioritize efforts, and serve as benchmarks to measure success, ensuring everyone understands why the change matters.

  • Scope: Establishes the boundaries of the change by clarifying what is included and excluded. A defined scope prevents overreach, manages expectations, and keeps teams focused on realistic goals, reducing confusion during planning and execution.

  • Stakeholder mapping: Identifies all individuals or groups affected by the change. It clarifies roles, influence, and impact. This ensures key voices are heard, responsibilities are assigned, and the right people are engaged throughout the process.

  • Impact analysis: Evaluates how the change will affect systems, workflows, teams, and customers. By anticipating disruptions and resource needs, leaders can prioritize critical areas, provide targeted support, and reduce friction during implementation.

  • Communication strategy: Defines how updates will be delivered and feedback collected. Clear, consistent messaging builds trust, reduces uncertainty, and increases employee confidence, creating smoother adoption across the organization.

  • Risk assessment: Highlights potential challenges, from operational setbacks to employee resistance. Documenting risks and creating response strategies enables leaders to act promptly when issues arise, thereby maintaining project momentum and protecting business continuity.

  • Approval workflows: Outlines how the plan and its actions are reviewed, escalated, and signed off. Transparent decision-making processes eliminate bottlenecks, ensure accountability, and keep the project moving quickly.

Step-by-step process to create a change management plan

Creating a change management plan can feel complex, but breaking it into structured steps makes it manageable. To see how this works in practice, let's use an example: a company rolling out a new CRM system to 500 employees across sales, marketing, and customer success departments.

Here are the nine key steps the company needs to follow:

Step #1: Define the change and goals

Start by clarifying what the change is and why it matters. Goals give the plan direction and create benchmarks for success. One of the biggest reasons change management plans fail is starting with an incomplete or poorly defined strategy. Setting measurable goals early provides the foundation for every phase that follows.

Example: Replace outdated spreadsheets with a CRM that enhances sales pipeline visibility and streamlines response times. A success metric could be 90% adoption within two months of launch.

Step #2: Establish scope

Determine what is included in the change and what is not. Setting boundaries keeps expectations realistic and prevents the project from expanding beyond scope.

Example: Sales, marketing, and customer success moves to the CRM in this phase, while finance integration waits until phase two.

Step #3: Assess readiness

Assess whether teams are prepared for the change by examining their skills, workload, and attitude toward the upcoming shift.

Example: A readiness survey reveals that sales teams are enthusiastic, but marketing requires assistance in cleaning existing data. This guides how to prioritize support.

Step #4: Map stakeholders

List everyone involved—from decision-makers to those most affected. Stakeholder mapping ensures the right voices are included and accountability is clear.

Example: Executive sponsor, IT owner, sales managers, and regional champions are identified as key roles. Champions or change agents serve as early adopters to encourage their peers.

Step #5: Analyze the impact

Consider how the change will alter daily work, processes, and outcomes. This helps leaders prepare employees for what's ahead.

Example: Sales reps log all calls and emails in the CRM, managers rely on dashboards instead of manual reports, and the marketing depatrment captures leads directly in the system.

Step #6: Design the communication plan

Communication keeps employees engaged and reduces uncertainty. Decide what to share, when, and through which channels.

Example: Monthly leadership updates, weekly emails from project leads, and manager-led team meetings ensure consistent, role-specific communication.

Step #7: Create training and support plan

Give people the skills and confidence to adapt. Training should match job roles and be reinforced with ongoing support.

Example: Representatives participate in live training sessions, managers receive advanced analytics training, and all employees can access self-paced tutorials and attend drop-in office hours.

Step #8: Manage risks and approvals

Identify risks early and establish the process for approving decisions. This keeps the project moving and minimizes setbacks.

Example: Low adoption is flagged as a top risk, with a mitigation plan of manager coaching if login rates drop. A weekly steering group is set to approve budget or scope changes.

Step #9: Track results and reinforce change

Measure adoption and performance over time, then reinforce the behaviors to ensure the change sticks.

Example: Monitor login frequency, track improvements in sales cycle times, and celebrate wins. Retire old spreadsheets to prevent backsliding, and offer refresher training after 30 and 90 days.

Why these steps matter

These steps go beyond a single project, forming the foundation of effective organizational change management.

By defining goals, aligning stakeholders, preparing employees, and reinforcing adoption, leaders create a repeatable framework for future transitions. A structured plan ensures the organization moves forward with clarity and resilience whether the change involves new technology, processes, or culture.

How Fine Hygienic Holding strengthened change management with Freshservice

Fine Hygienic Holding's IT team needed more visibility and control over a growing volume of change requests. Manual processes made it difficult to track approvals, evaluate risks, and ensure changes were aligned with business goals.

By introducing Freshservice's change management module, Fine Hygienic Holding gained a centralized view of all requests. Each change could now be logged, categorized, and reviewed more transparently. Approval workflows were built directly into the system, reducing delays and ensuring accountability. Teams could collaborate more effectively, with clear visibility into the impact of each change.

The result was a more structured, reliable approach to change management. What was once fragmented and time-consuming became transparent, trackable, and easier to manage. With Freshservice, the company ensured consistent execution of changes while minimizing the risk of disruption to business operations.

What are the phases in planning for change?

Successful change doesn't happen all at once. It moves through a series of phases that build on each other. Skipping steps or rushing the sequence often leads to resistance or stalled adoption. A well-structured change management plan guides the organization from awareness to lasting results.

Here are the key phases of planning for change:

Phase

What it involves

Example

Assessment

Understand the current state, readiness, risks, and barriers. This ensures the plan is grounded in reality.

A company planning a CRM rollout surveys employees about current tools and comfort with technology. Sales shows enthusiasm, but marketing needs extra support.

Strategy development

Translate insights into a roadmap. Define objectives, scope, and stakeholder roles to guide the transition.

The project team sets a 90% adoption goal in 60 days, limits the scope to three departments, and assigns regional champions.

Communication planning

Create a plan for what to communicate, when, and to whom. Consistent messaging reduces uncertainty and resistance.

A communication calendar includes leadership updates, department briefings, and a company-wide FAQ so employees know what to expect.

Training and enablement

Equip employees with the knowledge and tools they need. Training should be role-specific and practical.

Sales reps attend hands-on CRM sessions, managers learn reporting features, and self-serve tutorials are available for all.

Implementation

Put the change into action, often in phases to reduce disruption. Monitor closely during rollout.

The company launched CRM in two pilot regions before expanding to all departments in waves.

Monitoring and reinforcement

Track adoption, gather feedback, and reinforce desired behaviors to sustain the change.

Usage data shows lower adoption in customer success. Managers provide refresher training and share success stories across the company.

Importance of sequencing in change planning

Each phase sets up the next: assessment informs strategy, strategy shapes communication, communication supports training, and training enables smooth implementation. Monitoring closes the loop, ensuring the change delivers long-term results.

A well-sequenced organizational change management plan transforms one-time execution into a repeatable model for future transitions.

Templates and examples: Putting your plan into practice

Templates offer structure and clarity in change management. Whether creating forms, tracking requests, or communicating milestones, the correct format keeps you organized. Below are five template types, each supporting a key process: change request, log, communication, impact assessment, and overall planning.

1. Organizational change management plan (Visme)

What it offers: A fully customizable, nine-page document (U.S. letter format) with editable images, colors, and branding.

How to use it: Use this as your master change request and overview document. It captures the initiative's justification, scope, objectives, stakeholder groups, and high-level timeline. For example, when proposing a primary tool or process change, you can present this template to leaders to map out what's driving the change, who's involved, and initial milestones.

2. Visual collaboration and mapping (Miroverse)

What it offers: Interactive canvas templates that help teams explore questions like "Where are we now?" and "Where do we want to go?"

How to use it: Ideal for stakeholder mapping or impact analysis workshops. Invite teams to co-create visual maps: list affected roles, sketch process shifts, or surface fears and risks. Once complete, export snapshots into your main plan or use them as discussion aids in planning sessions.

3. Slide-based change plans (SlidesCarnival)

What it offers: Professionally designed slide decks for PowerPoint, Google Slides, or Canva, optimized for sharing change plans clearly and visually.

How to use it: Transform key parts of your plan, such as the communication strategy, high-level timeline, or change objectives, into polished slides. Use them in leadership briefings or all-hands presentations to keep messaging clear and engaging.

4. Communication documents (Canva)

What it offers: A gallery of clean, customizable documents for communications, FAQs, email templates, posters, and quick guides.

How to use it: Use these formats to create tailored assets for different audiences. For instance, share an FAQ doc with frontline staff, use a visually appealing one-pager for executive updates, or craft job-aid posters for break rooms. Every asset stays branded and consistent.

5. HR-focused change plan (Template.net)

What it offers: Downloadable templates in Word, PDF, Google Docs, etc., with suggested sections such as objectives, strategy, and action plan, designed for human-focused transitions.

How to use it: Use this when change impacts roles, structure, or workforce expectations. It helps you assess the impact on employees, align training and support plans, and document HR-related concerns, such as changes in responsibilities or policies.

Where these templates shine

Template purpose

Best fit for

Real-world use

Visme Plan

Change request and overview

Propose a tool implementation, outline goals, timeline, and stakeholders

Miro Canvas

Mapping and impact

Facilitate remote workshops to visualize impact across teams

SlidesCarnival Deck

Stakeholder presentations

Brief executives or teams with straightforward, branded visual storytelling

Canva Docs

Communications

Share FAQs, quick guides, or rollout announcements—tailored per audience

Template.net HR Plan

People-focused change

Plan role transitions, policy changes, and support for affected employees

Pro tip: Don't overlook the role of AI in change management.

AI helps leaders make smarter, faster decisions, from predicting resistance to tracking adoption trends. Building AI into your change management plan gives you a modern edge and increases your chance of success.

Organizational vs. IT change management planning

Not all change looks the same. Some initiatives reshape how people work together, while others transform the systems and tools they rely on. A strong change management plan can guide both, but the focus areas differ.

Organizational change management planning

Organizational planning centers on the human side of change—shifts in culture, leadership, or structure. It focuses on how people adapt, what support they need, and how to maintain morale during transitions.

Examples

  • Restructuring departments after a merger

  • Rolling out a new company-wide performance model

  • Driving culture change to improve collaboration

IT change management planning

IT change management addresses the technical side, systems, workflows, and infrastructure. It emphasizes minimizing downtime, ensuring data integrity and preparing users for new technologies.

Examples

  • Implementing a new CRM or ERP system

  • Migrating data to the cloud

  • Upgrading security protocols

Aspect

Organizational planning

IT planning

Focus

People, culture, structure

Systems, workflows, infrastructure

Primary risk

Employee resistance, morale dips

Downtime, data loss, security gaps

Key activities

Stakeholder engagement, communication, and training

Testing, rollout scheduling, and technical support

Example scenario

Shifting to a new management structure

Rolling out enterprise-wide software

Where they overlap

Despite their differences, both rely on the same principles: clear objectives, stakeholder mapping, risk assessment, communication, and reinforcement.

Whether guiding employees through a cultural shift or ensuring smooth deployment of IT systems, the same structured steps help change succeed.

Best practices for change management plans

A well-designed change management plan isn't just about the steps; it's also about how they are carried out. The following change management best practices strengthen execution and make change more sustainable:

  • Securing leadership support: Change gains traction when leaders visibly champion it. Executive sponsorship signals priority, builds trust, and motivates teams to follow through.

  • Setting clear objectives: Define success from the outset. Clear goals sharpen decisions, align teams, and provide benchmarks to measure real impact.

  • Communicating consistently: Deliver updates regularly across multiple channels. Consistent messaging reduces uncertainty, reinforces key points, and ensures everyone knows their role.

  • Providing regular training: Equip employees with the skills to succeed. Ongoing training builds confidence, fosters competence, and smoothens the adoption of new processes or systems.

  • Involving stakeholders early: Engage teams at every level before rollout. Early involvement surfaces issues, secures buy-in, and accelerates adoption.

  • Integrating feedback loops: Create avenues for questions, insights, and concerns. Real-time feedback enables leaders to address resistance and refine their strategies on the fly.

  • Reviewing progress iteratively: Track milestones and course-correct as needed. Iterative reviews prevent small issues from becoming major roadblocks and keep efforts aligned with business goals.

  • Reinforcing and recognizing wins: Celebrate every achievement, big or small. Reinforcement maintains momentum and demonstrates that employee contributions are valued.

Leveraging change management frameworks and models for your plan

A strong organizational change management plan must not be built from scratch. Proven change management models give you a foundation to structure your approach, reduce resistance, and guide adoption. Here are three widely used models that can support your planning:

1. Prosci's ADKAR model

The ADKAR model focuses on the individual journey through change. It breaks adoption into five steps: Awareness, Desire, Knowledge, Ability, and Reinforcement.

How it helps: Useful when you want to track how employees progress from first hearing about a change to fully adopting it.

Example use: During a CRM rollout, leaders check if employees are aware of the change, motivated to adopt it, appropriately trained, able to use the tool, and continuously reinforced with support.

2. Kotter's 8-step model

John Kotter's model provides a structured, leadership-driven process for managing organizational change. The steps include creating urgency, building a coalition, forming a vision, and anchoring a cultural shift.

How it helps: Designed for significant, organization-wide transformations where leadership alignment and communication are critical.

Example use: In a restructuring initiative, Kotter's framework guides leaders through aligning stakeholders, communicating a vision, and embedding the new structure into daily routines.

3. McKinsey 7S framework

This model emphasizes alignment across seven elements: strategy, structure, systems, shared values, style, staff, and skills. It emphasizes that organizational change impacts more than just processes.

How it helps: Effective when change touches multiple aspects of the business, ensuring both complex (systems, structure) and soft (values, culture) factors are addressed.

Example use: When introducing a new performance management system, the 7S framework helps leaders consider not only technology but also staff roles, leadership style, and cultural values.

Choosing the right model

Each framework brings a different lens. ADKAR focuses on people, Kotter emphasizes leadership and momentum, and McKinsey highlights organizational alignment. The best approach often blends elements from all three, tailored to your project's scope and context.

Measuring success: KPIs for your change management plan

A change management plan is only as strong as its outcomes. Measuring progress through clear key performance indicators (KPIs) helps leaders understand if the change is being adopted, where resistance exists, and how smoothly the transition moves.

Here are the most critical change management KPIs to track:

  • Adoption rates: Measure the number of employees using the new process, system, or behavior compared to the total expected users.

How to track it: System login data, feature usage reports, and workflow completion rates show whether employees integrate the change into their daily work.

  • Stakeholder engagement: Measure the level of stakeholder involvement in the change process, as indicated by participation in meetings, approvals, or communication activities.

How to track it: Attendance in project sessions, response rates to surveys, and participation in feedback workshops indicate whether key voices are engaged.

  • Resistance levels: Identify where pushback is happening and why. Resistance can appear as missed training, negative feedback, or reluctance to change workflows.

How to track it: Anonymous surveys, help desk tickets, and manager reports provide visibility into concerns. Tracking recurring issues helps leaders respond quickly.

  • Timeline adherence: Monitor whether the project is achieving milestones as planned. Delays in one phase can impact adoption and morale in later stages.

How to track it: Compare planned milestones against actual delivery dates. Utilize project management tools to visualize project slippage and adjust resources as needed.

Why KPIs matter

By tracking these KPIs, leaders can identify early warning signs, reinforce what's working, and make course corrections in real-time. Adoption, engagement, resistance, and timelines give a balanced picture of whether a change management plan delivers on its goals or not.

Why Freshservice is the right partner for change management success

Managing change in IT environments requires more than just approvals and timelines. Teams need a structured, scalable way to evaluate impact, reduce risk, and guide every transition from start to finish. Freshservice makes this easier by embedding change management into its modern ITSM platform.

As a cloud-based IT service management solution, Freshservice combines ease of use with robust workflows tailored for IT change control. It helps IT leaders manage everything from minor updates to major infrastructure shifts, ensuring changes are safe, documented, and aligned with business goals.

Its key change management features include:

  • Built-in change lifecycle management to capture reasons for change, conduct impact assessments, and create rollout and backout plans.

  • Change Advisory Board (CAB) workflows for structured approvals and expert oversight within the system.

  • Change categorization and tracking with filters for type, priority, and status, plus linked records for incidents, problems, and releases.

  • Unified ITSM integration connecting change management with incident, asset, and release management on a single dashboard.

  • Automation and orchestration to streamline recurring change processes and reduce manual errors.

  • Comprehensive reporting and analytics to measure change success, spot risks, and track outcomes over time.

With these capabilities, Freshservice helps IT teams move from ad hoc changes to structured, reliable change execution. It provides visibility, control, and accountability at every stage, making change less disruptive and predictable.

Frequently asked questions related to the change management plan

Can I use templates to build a change management plan?

Yes. Templates provide structure and save time by covering essential elements such as objectives, stakeholder maps, communication, and risk assessment. They act as starting points so that you can adapt to your organization's needs, ensuring consistency while leaving room for customization and flexibility.

How do frameworks like ADKAR support change planning?

Frameworks such as Prosci's ADKAR break change into stages—awareness, desire, knowledge, ability, and reinforcement. This helps leaders focus on the human side of change, track progress at the individual level, and design strategies that improve adoption, making organizational change easier to manage and sustain

Are there common mistakes to avoid when planning change?

Yes. Common mistakes include unclear objectives, poor communication, lack of leadership support, ignoring employee feedback, and rushing training. Skipping these basics increases resistance and reduces adoption. A structured change management plan prevents these errors by sequencing activities and keeping stakeholders engaged throughout the transition.

How does AI improve change management planning?

AI can automate repetitive tasks, analyze data for risk patterns, and provide insights into adoption trends. Tools with AI features, like predictive analytics or intelligent workflows, help leaders make faster, evidence-based decisions. This reduces delays, improves accuracy, and strengthens the overall change planning process.

What is the difference between change management and project management?

Project management focuses on delivering the technical side of a project, including scope, budget, and timelines. Change management focuses on the people side, helping employees adapt to new processes, tools, or structures. Together, they ensure the solution and its adoption succeed within the organization.

Can a change management plan reduce employee resistance?

Yes. Resistance often comes from uncertainty or lack of support. A change management plan addresses this by providing clear communication, targeted training, and feedback channels. The plan reduces pushback and builds confidence in the change process by anticipating concerns and involving stakeholders early.

How does a change management plan align with ITIL practices?

ITIL emphasizes structured service management, including defined processes for handling change. A change management plan aligns by documenting steps, approvals, risks, and communication strategies. This ensures changes to IT services are controlled, minimize disruption, and remain consistent with broader service management best practices.